I
nternet gathering place for custom rod builders
  • Custom Rod Builders - This message board is provided for your use by the sponsors listed on the left side of the page. Feel free to post any question, answers or topics related in any way to custom building. When purchasing products please remember those who sponsor this board.

  • Manufacturers and Vendors - Only board sponsors are permitted and encouraged to promote and advertise products on the board. You may become a sponsor for a nominal fee. It is the sponsor fees that pay for this message board.

  • Rules - Rod building is a decent and rewarding craft. Those who participate in it are assumed to be civilized individuals who are kind and considerate in their dealings with others. Please respond to others in the same fashion in which you would like to be responded to. Registration IS NOW required in order to post. You must include your actual First and Last name and a correct email address when registering or posting. Posts which are inflammatory, insulting, or that fail to include a proper name and email address will be removed and the persons responsible will be barred from further participation.

    Registration is now required in order to post. You must include your actual First and Last name and a correct email address when registering or posting.
SPONSORS

2024 ICRBE EXPO
CCS Database
Custom Rod Symbol
Common Cents Info
American Grips Piscari
American Tackle
Anglers Rsrc - Fuji
BackCreek Custom Rods
BatsonRainshadowALPS
CRB
Cork4Us
HNL Rod Blanks–CTS
Custom Fly Grips LLC
Decal Connection
Flex Coat Co.
Get Bit Outdoors
HFF Custom Rods
HYDRA
Janns Netcraft
Mudhole Custom Tackle
MHX Rod Blanks
North Fork Composites
Palmarius Rods
REC Components
RodBuilders Warehouse
RodHouse France
RodMaker Magazine
Schneiders Rod Shop
SeaGuide Corp.
Stryker Rods & Blanks
TackleZoom
The Rod Room
The FlySpoke Shop
USAmadefactory.com
Utmost Enterprises
VooDoo Rods

Room temperture vs. finish drying time
Posted by: Hunter Armstrong (---.rcmdva.east.verizon.net)
Date: November 20, 2010 12:35PM

For a variety of reasons, my work space is rather chilly (60 degrees or so), and this isn't going to change. Last night I applied a coat of Threadmaster Lite to to a blank in preparation for marbling. Well, after 12 hours, my control piece is still tacky to the touch. Before marbling, I want the finish to be tack-free, but, of course, it needs to be done before the finish has completely cured. Normally, I would do this well within 24 hours. How much has this window opened, or does anyone know? Does anyone have any guidelines for curing times in lower temperatures? Specifically, with Threadmaster Lite. Thanks.
Slainte,
Hunter

From ghoulies and ghosties,
and long leggedy beasties,
and things that go bump in the night,
Good Lord deliver us!

Options: ReplyQuote
Re: Room temperture vs. finish drying time
Posted by: bill boettcher (---.dyn.optonline.net)
Date: November 20, 2010 02:07PM

You can try some gentle heat from a hair drier or heat gun maybe several times Don't cook it or it will sag.

Bill - willierods.com

Options: ReplyQuote
Re: Room temperture vs. finish drying time
Posted by: Mike Barkley (---.nap.wideopenwest.com)
Date: November 20, 2010 03:00PM

Just curious, why would you want it tacky??? Marbling is usually done with the base in a liquid state to get the colors to blend like marble

Mike (Southgate, MI)
If I don't want to, I don't have to and nobody can make me (except my wife) cuz I'm RETIRED!!

Options: ReplyQuote
Re: Room temperture vs. finish drying time
Posted by: bill boettcher (---.dyn.optonline.net)
Date: November 20, 2010 03:06PM

Here [www.rodbuilding.org]

Bill - willierods.com

Options: ReplyQuote
Re: Room temperture vs. finish drying time
Posted by: Hunter Armstrong (---.rcmdva.east.verizon.net)
Date: November 20, 2010 03:21PM

Mike,
I think you misunderstand me. I don't want the base coat tacky. I want it to firm up so I can put on the next coat and add color pigments. My problem is that the finish is remaining tacky too long. I imagine that it is a function of room temperature. With that in mind, I am trying to determine how far open the windows are for applying the second coat. I would imagine that the normal 24 hour approach can be modified, just a tad. I am not sure by how much, though. Thanks to you, and everyone else, for the responses, though.
Tight lines,
Hunter

From ghoulies and ghosties,
and long leggedy beasties,
and things that go bump in the night,
Good Lord deliver us!

Options: ReplyQuote
Re: Room temperture vs. finish drying time
Posted by: Tom Kirkman (Moderator)
Date: November 20, 2010 05:30PM

From about 70F, every drop of about 20F will result in a doubling of the set and cure time.

..............

Options: ReplyQuote
Re: Room temperture vs. finish drying time
Posted by: roger wilson (---.hsd1.mn.comcast.net)
Date: November 20, 2010 09:04PM

Hunter,
Go to an appliance store and pick up a cardboard box that is used to go around refrigerators.
Take the box home, and use a box cutter, and tape to create a box that you can drop over the top of your rod that is being dried.
You can make the box so that you can lay it on the side, put the dryer inside, and have a side lid - held on by tape that will enclose the rod.

Then, just put a couple of 25 light bulbs inside the box for a bit of gentle heat and you are good to go. You will be able to take your 60 degree temps up to 75 or 80 depending on the size bulbs that you place in the box

It will cost you about $3 to add the lights, and the cardboard should be free. You might have to buy a roll of tape.

Have your temperature about 90 degrees, and you will be ready to recoat in about 6 hours or so.


Good luck
Roger

Options: ReplyQuote
Re: Room temperture vs. finish drying time
Posted by: roger wilson (---.hsd1.mn.comcast.net)
Date: November 21, 2010 02:04AM

p.s.
Here are a couple examples of drying cabinets with heaters that have been made by other viewers:

[www.rodbuilding.org]

[www.rodbuilding.org]

Options: ReplyQuote
Re: Room temperture vs. finish drying time
Posted by: roger wilson (---.hsd1.mn.comcast.net)
Date: November 21, 2010 02:12AM

Here is another link for some discussion and pictures of some different dryer cabinets>

[rodbuilding.org]

Options: ReplyQuote
Re: Room temperture vs. finish drying time
Posted by: Hunter Armstrong (---.rcmdva.east.verizon.net)
Date: November 21, 2010 01:56PM

Thanks for all the information and suggestions. As it happens, things worked out okay. Tom, it was especially good to learn that little bit of trivia concerning curing times. Hopefully, I will retain that for a while.
Slainte,
Hunter

From ghoulies and ghosties,
and long leggedy beasties,
and things that go bump in the night,
Good Lord deliver us!

Options: ReplyQuote
Re: Room temperture vs. finish drying time
Posted by: bill boettcher (---.dyn.optonline.net)
Date: November 23, 2010 01:06PM

Put a piece of tape on your dryer and wright it on it.

Bill - willierods.com

Options: ReplyQuote


Sorry, only registered users may post in this forum.
Webmaster